Weegbrug

Weighbridge repair.

The concrete of the weighbridge was completely damaged by salt.

The concrete has been ground and partly shot-blasted, and then repaired with an epoxy from Belzona. The weighbridge was subsequently fully coated and equipped with an anti-slip system.